刘宇生, 许超, 攸国顺, 等. 非能动核电厂全厂断电事故自然循环现象研究[J]. 核技术, 2018,41(11):110603
Yusheng LIU, Chao XU, Guoshun YOU, et al. Study on natural circulation phenomena of passive nuclear power plant under station blackout accident[J]. Nuclear techniques, 2018, 41(11): 110603
刘宇生, 许超, 攸国顺, 等. 非能动核电厂全厂断电事故自然循环现象研究[J]. 核技术, 2018,41(11):110603 DOI: 10.11889/j.0253-3219.2018.hjs.41.110603.
Yusheng LIU, Chao XU, Guoshun YOU, et al. Study on natural circulation phenomena of passive nuclear power plant under station blackout accident[J]. Nuclear techniques, 2018, 41(11): 110603 DOI: 10.11889/j.0253-3219.2018.hjs.41.110603.
为识别全厂断电事故下非能动核电厂的主要热工水力现象,对AP1000核电厂全厂断电工况下的事故序列和自然循环现象进行了研究。通过建立AP1000的节点模型,进行了全厂断电事故序列的模拟,并划分了事故阶段,分析了非能动堆芯冷却系统中堆芯补水箱(Core Makeup Tank,CMT)投入失效和安全壳内置换料水箱(In-containment refueling water storage tank,IRWST)参数异常对事故自然循环过程的影响,研究结果表明:全厂断电事故下,非能动核电厂的堆芯衰变热由多个单相自然循环过程导出,其中堆芯与非能动余热排出热交换器(Passive Residual Heat Removal Heat Exchanger,PRHR HX)之间的自然循环对堆芯衰变热的导出具有显著影响。根据热阱的不同和系统参数变化的特点,事故序列可划分为主回路自然循环、非能动堆芯冷却系统(PassiveCore Cooling System,PXS)自然循环和长期冷却三个阶段;CMT投入、IRWST水箱参数对PXS自然循环过程存在重要影响。
Background
2
Station blackout (SBO) accidents increasingly become the focus of research in the field of nuclear safety after Japan's Fukushima nuclear plant accident. Core decay heat under SBO condition will be transferred by natural circulation (NC) occurring in passive systems for the nuclear plants incorporated passive safety design concept such as AP1000 or CAP1400. As a result
response of safety systems will differ in accident sequence and kind between passive safety plant and traditional plant.
Purpose
2
This study aims to identify main thermal hydraulic phenomena of passive nuclear power plants (NPPs) during SBO accident.
Methods
2
SBO accident progress and NC phenomena of AP1000 were investigated. The event sequence and stages were obtained as a result of Relap5 simulation with the nodalization model established according to design parameters. The sensitivity analysis for injection quantity of core makeup tank (CMT) and parameter deviation of in-containment refueling water storage tank (IRWST) were also conducted in the calculation.
Results
2
The results show that multiple NC phenomena occur in loop formed by core
steam generators
passive residual heat removal heat exchanger (PRHR HX)
and CMTs under accident conditions. The whole SBO accident progress of passive NPPs can be divided into three periods
namely reactor coolant system (RCS) NC process
passive core cooling system NC process and long term cooling process
based on characteristics of heat sink and parametric variation. What is more
the natural circulation rate between core and PRHR HX
pressure of RCS are both significantly affected by the injection failure of one CMT and parameter deviation of IRWST.
Conclusions
2
The NC process between core and PRHR HX plays a vital role in removal of core decay heat. The multiple NC processes occurring in passive core cooling system NC process period are unique to passive NPPs and they are worthy of research in experimental verification and code development.
Takeshi Takeda , Hideo Nakamura . RELAP5 code study of ROSA/LSTF experiment on a PWR station blackout (TMLB') transient . Mechanical Engineering Journal , 2014 . 1 ( 4 ): 1 DOI: 10.1115/ICONE21-16811 http://doi.org/10.1115/ICONE21-16811 .
Yeonsik Kim , X G Yu , Kyoungho Kang , . Analysis of a station blackout scenario with an ATLAS test . Nuclear Engineering and Technology , 2013 . 45 ( 2 ): 179 - 190 . DOI: 10.5516/NET.02.2012.007 http://doi.org/10.5516/NET.02.2012.007 .
S W Lee , T H Hong , M R Seo , . Extended station blackout coping capabilities of APR1400 . Science and Technology of Nuclear Installations , 2014 . 980418 1 - 10 . DOI: 10.1155/2014/980418 http://doi.org/10.1155/2014/980418 .
聂 昌举 . AP1000全厂断电事故分析 . 核电工程与技术 , 2011 . ( 3 ): 16 - 20 . http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=QK201104603737 .
Changju NIE . AP1000 station blackout analysis . Nuclear Power Engineering and Technology , 2011 . ( 3 ): 16 - 20 . http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=QK201104603737 .
袁 添鸿 , 于 雷 , 王 川 . 全厂断电事故下AP1000非能动余热排出系统分析 . 原子能科学技术 , 2010 . 44 ( zl ): 248 - 252 . http://d.old.wanfangdata.com.cn/Periodical/yznkxjs2010z1049 .
Tianhong YUAN , Lei YU , Chuan WANG . Research on passive residual heat remove system under loss of power . Atomic Energy Science and Technology , 2010 . 44 ( z1 ): 248 - 252 . http://d.old.wanfangdata.com.cn/Periodical/yznkxjs2010z1049 .
G E Wilson , B E Boyack . The role of the PIRT process in experiments, code development and code applications associated with reactor safety analysis . Nuclear Engineering & Design , 1998 . 186 ( 1-2 ): 23 - 37 . https://www.sciencedirect.com/science/article/pii/S0029549398002167#! .
K H Kang , B U Bae , J R Kim , . Development of a phenomena identification ranking table for simulating a station blackout transient of a pressurized water reactor with a thermal-hydraulic integral effect test facility . Annals of Nuclear Energy , 2015 . 75 72 - 78 . DOI: 10.1016/j.anucene.2014.07.050 http://doi.org/10.1016/j.anucene.2014.07.050 .
石 , 叶 子申 , 李 玉全 , . 功率比可变的非能动核电站SBO事故比例分析研究 . 节能技术 , 2016 . 34 ( 6 ): 553 - 557 . DOI: 10.3969/j.issn.1002-6339.2016.06.015 http://doi.org/10.3969/j.issn.1002-6339.2016.06.015 .
Yan SHI , Zishen YE , Yuquan LI , . Variable power ratio scaling analysis of station blackout accident in passive safety nuclear power plant . Energy Conservation Technology , 2016 . 34 ( 6 ): 553 - 557 . DOI: 10.3969/j.issn.1002-6339.2016.06.015 http://doi.org/10.3969/j.issn.1002-6339.2016.06.015 .
林 诚格 , 郁 祖盛 . 非能动安全先进压水堆核电技术 , : 北京 原子能出版社 , 2010 .
Chengge LIN , Zusheng YU . Passive safety advanced pressurized water reactor nuclear power technology , : Beijing Atomic Energy Press , 2010 .
S Y Lee , C J Choi , C S Lee , . Phenomena identification and ranking table for the APR1400 main steam line break . Journal of the Korean Nuclear Society , 2004 . 36 ( 5 ): 388 - 402 . https://www.sciencedirect.com/science/article/pii/S0149197014000109#! .
T J Liu , C H Lee , Y S Way . ⅡST and LSTF counterpart test on PWR station blackout transient . Nuclear Engineering & Design , 1997 . 167 ( 3 ): 357 - 373 .
刘 展 , 王 喆 , 张 国胜 , . AP1000核电厂应对全厂断电事故的稳压器防满溢对策研究 . 原子能科学技术 , 2014 . 48 ( 4 ): 652 - 655 . DOI: 10.7538/yzk.2014.48.04.0652 http://doi.org/10.7538/yzk.2014.48.04.0652 .
Zhan LIU , Zhe WANG , Guosheng ZHANG , . AP1000 plant pressurizer overfilling prevention study against station blackout accident . Atomic Energy Science and Technology , 2014 . 48 ( 4 ): 652 - 655 . DOI: 10.7538/yzk.2014.48.04.0652 http://doi.org/10.7538/yzk.2014.48.04.0652 .