YANG Bingfan GUAN Xialing CAO Xiaoping ZHANG Tianjue LI Zhenguo CHU Chengjie CUI Baoqun ZHOU Lipeng PENG Zhaohua BAO yiwen TANG Hongqing WU Haicheng. Progresses in the project of upgrading HI-13 tandem accelerator at CIAE[J]. Nuclear techniques, 2008, (1): 41-46.
YANG Bingfan GUAN Xialing CAO Xiaoping ZHANG Tianjue LI Zhenguo CHU Chengjie CUI Baoqun ZHOU Lipeng PENG Zhaohua BAO yiwen TANG Hongqing WU Haicheng. Progresses in the project of upgrading HI-13 tandem accelerator at CIAE[J]. Nuclear techniques, 2008, (1): 41-46.DOI:
A project has been in progress at CIAE(China Institute of Atomic Energy)to upgrade the HI-13 tandem accelerator into the Beijing Radioactive Ion-beam Facilities(BRIF).On upstream of the tandem
a 100 MeV/200μA proton cyclotron(CYCIAE-100)
acting as a driver
and an isotope separator on line(ISOL)with a mass resolution of 20000
are to be built;while a superconducting linac booster(SCB)with an energy gain of 2 MeV/q is to be added to down-stream of the tandem.The proton beam from CYCIAE-100 bombards target-source on the ISOL to produce ra- dioactive ion-beam
which is accelerated by the HI-13 tandem and the booster for experiments.