您当前的位置:
首页 >
文章列表页 >
Analysis on the response time testing of OT/OPΔT protection for PWR
更新时间:2021-03-03
|
    • Analysis on the response time testing of OT/OPΔT protection for PWR

    • NUCLEAR TECHNIQUES   Vol. 38, Issue 4, Article number: 040606(2015)
    • DOI:10.11889/j.0253-3219.2015.hjs.38.040606    

      CLC:
    • Published:09 April 2015

    移动端阅览

  • XU Zhi, BAO Qi. Analysis on the response time testing of OT/OPΔT protection for PWR[J]. Nuclear techniques, 2015, 38(4): 040606 DOI: 10.11889/j.0253-3219.2015.hjs.38.040606.

  •  
  •  

0

Views

23

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on natural circulation phenomena of passive nuclear power plant under station blackout accident
AP1000 PSA model and its model format conversion
Structure integrity evaluation of AP1000 RPV under PTS
Experimental study on seismic qualification test of AP1000 main control room equipment
Research on control rod drive mechanism seismic test acceptance criteria

Related Author

Yusheng LIU
Chao XU
Guoshun YOU
Jieru AN
Shaoxin ZHUANG
李肇华
张忞隽
LIU Haibin LI Zhaohua ZHANG Minjun

Related Institution

Nuclear and Radiation Safety Center, Ministry of Environmental Protection
Shanghai Nuclear Engineering Research and Design Institute
State Nuclear Power Plant Service Company
Nuclear Equipment Qualification Center of Nuclear Power Institute of China
Shanghai Nuclear Engineering Research & Design Institute
0