您当前的位置:
首页 >
文章列表页 >
OLP embedment design method research for AP1000 nuclear plant
更新时间:2021-06-03
    • OLP embedment design method research for AP1000 nuclear plant

    • NUCLEAR TECHNIQUES   Vol. 36, Issue 4, Article number: 040663(2013)
    • DOI:10.11889/j.0253-3219.2013.hjs.36.040663    

      CLC: TM623.1;TU311.41
    • Published:2013

    移动端阅览

  • LI Cheng LI Shaoping LIU Jianwei. OLP embedment design method research for AP1000 nuclear plant[J]. Nuclear techniques, 2013, 36(4): 040663 DOI: 10.11889/j.0253-3219.2013.hjs.36.040663.

  •  
  •  

0

Views

118

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on natural circulation phenomena of passive nuclear power plant under station blackout accident
Analysis on the response time testing of OT/OPΔT protection for PWR
AP1000 PSA model and its model format conversion
Structure integrity evaluation of AP1000 RPV under PTS
Experimental study on seismic qualification test of AP1000 main control room equipment

Related Author

Yusheng LIU
Chao XU
Guoshun YOU
Jieru AN
Shaoxin ZHUANG
BAO Qi
XU Zhi
LIU Haibin LI Zhaohua ZHANG Minjun

Related Institution

Nuclear and Radiation Safety Center, Ministry of Environmental Protection
China Nuclear Power Engineering Co., Ltd.
Xianning Nuclear Power Plant Co., Ltd.
State Nuclear Power Plant Service Company
Nuclear Equipment Qualification Center of Nuclear Power Institute of China
0