您当前的位置:
首页 >
文章列表页 >
Verification of FEM in AP1000 main control room seismic qualification
更新时间:2021-06-03
    • Verification of FEM in AP1000 main control room seismic qualification

    • NUCLEAR TECHNIQUES   Vol. 36, Issue 4, Article number: 040613(2013)
    • DOI:10.11889/j.0253-3219.2013.hjs.36.040613    

      CLC: TL362.7
    • Published:2013

    移动端阅览

  • ZHU Yizhou MA Yuanrui XIE Yongcheng. Verification of FEM in AP1000 main control room seismic qualification[J]. Nuclear techniques, 2013, 36(4): 040613 DOI: 10.11889/j.0253-3219.2013.hjs.36.040613.

  •  
  •  

0

Views

70

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

No data

Related Institution

No data
0