您当前的位置:
首页 >
文章列表页 >
The operation and improvement of the 2×1.7MY tandem accelerator at Institute of physics
更新时间:2021-04-09
    • The operation and improvement of the 2×1.7MY tandem accelerator at Institute of physics

    • NUCLEAR TECHNIQUES   Issue 6, (1992)
    • Published:01 June 1992

    移动端阅览

  • Zhou Junsi Xu Tianbing Zhu Peiran Qiu Changqing Zheng Zongshuang Jiang Weilin Ren Wengmei. The operation and improvement of the 2×1.7MY tandem accelerator at Institute of physics[J]. Nuclear techniques, 1992, (6): 354-357. DOI:

  •  
  •  

0

Views

80

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Recent development on pelletron systems at NEC

Related Author

Yan Shengqing

Related Institution

Peking University
0