您当前的位置:
首页 >
文章列表页 >
Maintenance of 3 SDH tandem accelerator
更新时间:2021-04-09
    • Maintenance of 3 SDH tandem accelerator

    • NUCLEAR TECHNIQUES   Issue 6, (1992)
    • Published:01 June 1992

    移动端阅览

  • Ion Beam Iab. Institute of Materials Science. Maintenance of 3 SDH tandem accelerator[J]. Nuclear techniques, 1992, (6): 362-364. DOI:

  •  
  •  

0

Views

32

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation and optimization of cooling system for 2 m accelerating tube
The charge loss analysis of terminal for Peking University 5SDH-2 tandem
The status report on the Shanghai 4UH pelletron
Installation and problems of 6MV tandem accelerator

Related Author

LI Shaoqing1 SHEN Lianguan2 Pei Yuanji3 1
沈连婠
裴元吉
Shen Dingyu Wang Xuemei Li Shuozhong
王雪梅
李硕中
袁伦明
王志山

Related Institution

Department of Machinery & Electricity, Anhui Institute of Architecture & Industry, Hefei 230022) 2
中国科学技术大学精密机械与精密仪器系
中国科学技术大学国家同步辐射实验室
Peking University
北京大学
0