您当前的位置:
首页 >
文章列表页 >
Installation and problems of 6MV tandem accelerator
更新时间:2021-04-09
    • Installation and problems of 6MV tandem accelerator

    • NUCLEAR TECHNIQUES   Issue 6, (1992)
    • Published:01 June 1992

    移动端阅览

  • Zhang Zhongmu Lai Weiquan Jiao Shouhua Si Houzhi. Installation and problems of 6MV tandem accelerator[J]. Nuclear techniques, 1992, (6): 339-342. DOI:

  •  
  •  

0

Views

45

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation and optimization of cooling system for 2 m accelerating tube
Maintenance of 3 SDH tandem accelerator
The status report on the Shanghai 4UH pelletron
The status report on CIAE HI-13 tandem accelerator in the last four years

Related Author

LI Shaoqing1 SHEN Lianguan2 Pei Yuanji3 1
沈连婠
裴元吉
Ion Beam Iab. Institute of Materials Science
袁伦明
王志山
朱卫华
唐子逸

Related Institution

Department of Machinery & Electricity, Anhui Institute of Architecture & Industry, Hefei 230022) 2
中国科学技术大学精密机械与精密仪器系
中国科学技术大学国家同步辐射实验室
Tsinghua University
0