您当前的位置:
首页 >
文章列表页 >
Study of timing voltage divider system of PMT for neutron wall at CSR terminal
更新时间:2021-03-12
    • Study of timing voltage divider system of PMT for neutron wall at CSR terminal

    • NUCLEAR TECHNIQUES   Issue 6, (2005)
    • CLC: TL594
    • Published:01 June 2005

    移动端阅览

  • QI Huirong1, 2 WANG Jinchuan1 XIAO Guoqing1 GUO Zhongyan1 ZHAN Wenlong1 XU hushan1 LI Jiaxing1 SUN Zhiyu1 HU Zhengguo1 MAO Ruishi1, 2 LI Chen1, et al. Study of timing voltage divider system of PMT for neutron wall at CSR terminal[J]. Nuclear techniques, 2005, (6): 472-475. DOI:

  •  
  •  

0

Views

198

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A kind of photomultiplier tube with the highest linear current larger than 1.5 Afor measuring microsecond pulse signals
Preliminary experimental researches on 6—7 MeV quasi-monoenergetic pulsed γ-rays generation via intense pulsed proton beam striking 19F target
Gain stabilization of the scintillator-photomultiplier counting rates

Related Author

李忠宝
杨洪琼
彭太平
胡青元
张建华
王振通
周殿忠
叶文英

Related Institution

Institute of Nuclear Physics and Chemistry, China Academy of Engineering Physics, Mianyang, 621900) 2
中国工程物理研究院电子工程研究所
中国工程物理研究院核物理与化学研究所
Northwest Institute of Nuclear Technology,Xi′an
西北核技术研究所
0