we discuss the technical problems during installation and debugging of the hydrostatic leveling system(HLS) established on the linac
booster and storage ring of Shanghai Synchrotron Radiation Facility(SSRF)
and the ways to solve the problems.Before the system installation
all the sensors were tested to exclude anyone that failed
because of the reasons of transportation
to meet the accuracy requirement of the SSRF design.The test method and test process are given in detail.During the process of HLS system installation
we solved a number of problems that could not be anticipated
e.g problems of the supports and water supplying.The surveying results after system installation show that the system works normally and satisfies the designing requirement.
Preliminary study on the influence of the tides of planet earth on hydrostatic leveling system
A hydrostatic seveling system for position monitoring of high energy accelerator
Analysis of influence of pressure and temperature on HLS
Related Author
HE Xiaoye XU Shaofeng WANG Peng
许少峰
汪鹏
HE Xiaoye HUANG Kaixi CHEN Senyu LIU Zuping ZHAO Yinghai
黄开席
陈森玉
刘祖平
赵营海
Related Institution
University of Science and Technology of China
1 University of Science and Technology of China. Hefei 230029 2 High Energy Physics Institute, Chinese Academy of Science, Beijing 100039 3 Institute of Crustal Dynamics, China Earthquake Administration
中国科学院高能物理研究所
中国地震局地壳应力研究所
University of Science and Technology of China, Hefei 230029) 2