您当前的位置:
首页 >
文章列表页 >
Removing the secondary stress in structure analysis of ITER in-wall shields
更新时间:2021-03-05
|
    • Removing the secondary stress in structure analysis of ITER in-wall shields

    • NUCLEAR TECHNIQUES   Vol. 34, Issue 8, (2011)
    • CLC: TL626
    • Published:01 August 2011

    移动端阅览

  • WANG Kaisong1 XU Yang1 SONG Yuntao2 WANG Zhongwei21. Removing the secondary stress in structure analysis of ITER in-wall shields[J]. Nuclear techniques, 2011, 34(8): 637-640. DOI:

  •  
  •  

0

Views

54

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The status of ITER radioactive waste management and enlightenment to CFETR radioactive waste management
Calculation and analysis of activated corrosion products of multi-phase in water cooling loops under fusion reactor
In-situ high-pressure single crystal X-ray diffraction of natural pyromorphite and mimetite
Research on moment force compensation in structure analysis of ITER neutron shielding block
Synchrotron radiation X-ray diffraction investigation on the compressibility of lizardite

Related Author

WANG Xu
PAN Sheqi
ZHAO Qingkai
ZHANG Hailing
LI Rui
CHEN Chang'an
WANG Jianqiang
GUO Qingyang

Related Institution

Shanghai Institute of Applied Physics, Chinese Academy of Sciences
Institute of Materials, China Academy of Engineering Physics, Jiangyou
School of Nuclear Science and Engineering, North China Electric Power University
School of Earth and Space Sciences, Peking University
School of Gemmology, China University of Geosciences
0